5.9.2023
The subcontracted clinical routine analysis will conclude on September 5th, 2023. This pertains to the following studies:
fS-Kol, -Kol-HDL, -Kol-LDL, -Trigly, -Kol-VLDL, HDL/KOL
S -ASAT, ALAT, AFOS, GT, Krea, -CRPhs
S -Na, -K fS-Fe
5.9.2023
The subcontracted clinical routine analysis will conclude on September 5th, 2023. This pertains to the following studies:
fS-Kol, -Kol-HDL, -Kol-LDL, -Trigly, -Kol-VLDL, HDL/KOL
S -ASAT, ALAT, AFOS, GT, Krea, -CRPhs
S -Na, -K fS-Fe